prev

Bathroom

next

The skim-coat corrected the floor elevation. Once hardened (24 hours), I screwed down the 1/2" plywood sub-floor. It's now ready for the north wall to be installed.


Bathroom7.jpg
112.96 KB

Return to Bathroom

Return to Home Page