prev

Bay Window Replacement

next

After the foam insulation was installed, the plywood was screwed on. It's difficult to see in this picture that the window rough opening has separate plywood on it. I built a plug to fit the opening because the window was back-ordered and it's arrival date was not expected to be until January 2021.


BayWindowReplacement16.jpg
156.03 KB

Return to Bay Window Replacement Thumbnails

Return to Home Page